ACRD on Twitter

Whats New

New road construction Monday February 22, 2021 for approx. two weeks. Traffic control in place 7am-4pm.
 
 

Power Interruption

Power Interruption

A power interruption could last several days in some areas of the Alberni Valley. Such an event may occur as a result of severe storms, equipment failure or as part of a larger disaster. This Response Plan is designed to mitigate the effects of prolonged power failures that have led to disruption. BC Hydro is responsible for the restoration of power. The Emergency Operations Centre (EOC) can assist only indirectly.

Go to BC Hydro's website for detailed information

"Surviving a Disaster is Everyone's Business"