Millstream Water System
For problems with the water system contact:
During office hours of 8 am to 4:30 pm, contact the ACRD Administration office
Office: 250-720-2700
After hours: 250-206-3794
For information on your account contact:
ACRD Office
250-720-2700
- 2023 Millstream Water System Annual Report
- 2022 Millstream Water System Annual Report
- Millstream Water System Water Emergency Preparedness Plan
- 2021 Millstream Water System Annual Report
- 2022 Millstream Water System Application and information Sheet
- 2020 Annual Report - Millstream Water System
- Millstream Water System Brochure
- Millstream Water System Asset Management Plan v1.0
- Leak Policy
Visit the Bylaws Webpage to find related Water Bylaws including bylaws relating to Development Cost Charges (DCC) and Water Service Rates.
Millstream is a small residential community located approximately 3.5 km north of the District of Ucluelet. The area was originally developed by a logging contractor to provide accommodation for employees and their families. The existing water system was constructed between July and October in 1969. The type of pipe used was asbestos cement (A.C.), which was the current technology at the time. The original wood reservoir was replaced with a metal reservoir in the early 1990's. A contracted water operator runs the day to day operations of the Millstream Community Water System. The water operator is certified through the Environmental Operator Certificate Program (EOCP) to operate small water systems.
System overview:
- Water Source: Two shallow dug wells, 4.1 and 3.6 meters
- Treatment: none
- Disinfection: Chlorine
- Reservoir: Bolted steel, 656 m3
- Service connections: 50
- Length of mains: 980 m of 100mm
- Water main material: Asbestos Cement (AC)
- Average Daily Flow: 34.7 cu. meters
The water mains are mostly asbestos cement and are subject to radial fractures and softening over time. In the spring of 2014 the replacement of some of the water mains are scheduled for Lee Street, Mavis Avenue and Albion Crescent. In conjunction with the watermain replacement will be the installation of additional fire hydrants.
The reservoir is scheduled to be drawn down for a thorough inspection and cleaning in 2014. A connection to the District of Ucluelet's water system has been approved and was engineered in 2013. The construction is scheduled to commence in the spring of 2014. This connection will enable the community to be supplied with water during maintenance procedures or in drought.
Millstream Water Systems 2013 Monthly Consumption